Investment Summary of imported Machinery required for Making Precast elements for Affordable housing with various methods etc.: -
Sr. No. | Investment Summary of imported Machinery required for Making Precast elements for Affordable housing with various methods etc. | Total Price in USD Ex- works China |
---|---|---|
A | To make Pre-stressed Load bearing Hollow core slab used for Floor & Roof Size 120 x 600mm or 100 x 600mm. (Suitable - G + up to 4 floor) | UDS 34,120 |
B | To make Pre-stressed Load bearing Hollow core slab used for Floor & Roof Size 150 x 1200mm or 200 x 1200mm. (Suitable - G + up to 13 floor) | USD 1,00,218 |
C | To make Hollow core Non- load bearing Lightweight interlocking wall panels for Partition walls by extrusion process on concrete bed Size 90x 600 | USD 37,400 |
D | To make Precast Solid Load bearing Wall & to make Precast Half floor slab / Semi- finished floor (Slab with Lattice girder / Truss / Filigree) say about 1000 Sq. mtr / day By Method 1. Pallet circulating system in combination with Central Shifter. 34 Nos. of Pallet of size 3.5 x 12 mtrs. |
USD 5,81,840 |
E | Alternate & cheaper method to D above :- To make Precast Solid Load bearing wall & to make Precast Half floor slab / Semi- finished floor (Slab with Lattice girder / Truss / Filigree ) say about 1000 Sq.mtr / day By Method 2. Pallet placed in-line & Vibrated & Tilted by Mobile vibrating & Tilting shuttle (MVTS) 20x2=40Nos. Pallet of size 4 x 9 mtrs. In 2 lane. | USD 4,75,376 |
F | Staircase Molds | USD 8,500 |
A - Plant & Machinery for :- Pre-stressed, Precast Load Bearing Hollow Core Concrete Slabs / Planks duly Reinforced with steel strand
Size:- 120/100mm thick x 600mm width along with supporting Machinery.
Plant & Machinery for making Pre-stressed, Precast Load Bearing Hollow Core Concrete Planks for slabs used for Floor & Roof for G + 4 Heavy duty Boundary wall & Outer walls for Ware-housing / for making Toilet blocks / Trench / Gutter Cover / Garages / Factory shed / Mezzanine floor in steel building etc. below along with supporting Machinery in offer.
Sr. No | Item Descriptions for Plant & machinery for Pre-stressed, Precast Load Bearing Hollow Core Concrete Slabs / Planks duly Reinforced with steel strand by Extrusion process for size 120 /100mm thick x 600mm width. |
Qty. | Price in USD Ex- works China | Total Price in USD Ex- works China |
---|---|---|---|---|
1 | Extrusion M/c for Pre-stressed, Precast Load Bearing Hollow Core Concrete Slabs / Planks or for Heavy duty Boundary wall panels etc. Size: - 120 Thick X 600 mm Wide. Length to cut as per your requirement from a long extruded slab duly Reinforced with steel strand. OR Buy Extrusion M/c for Size: - 100 Thick X 600 mm Wide. Price - USD 6000/ set Ex-works china. |
1 Set | 6,500 | 6,500 |
2 | Concrete Mixer Dual body Twin shaft 25 CBM with 2 Bin dosing & batching plant 800 liters . Pl Note- Rotary mixer not suitable for Extrusion | 1 set | 13,850 | 13,850 |
3 | Tensioning / Stressing m/c. for reinforcement Rated capacity 1200 kgs, Jacking speed 1.5 mtr / min. Power 1.1 Kw | 1 Set | 2,700 | 2,700 |
4 | Dispensing / Pay-off Stand Sq. Heavy duty M.S. Steel frame for Steel Strands for: - 5 / 7 / 9.5mm diameter. | 1 Nos. | 475 | 475 |
5 | Anchors / Wedges for Steel Strands 100 Nos. each of Size 7 mm dia. | 50 Nos. | 8.5 | 425 |
6 | Battery operated Mini Dumper for unloading concrete mixture into the extrusion m/c. | 2 sets | 2,700 | 5,400 |
7 | Heavy duty Lifting Beam with 2 clamps & safety chain: - capacity 4 Ton. Lifting Load Bearing Planks of size up to 8 meters from Casting Beds. | 1 set | 2,700 | 2,700 |
8 | Cutting m/c. for above Slab / Wall panel slab. Size 180 x 600mm | 1 Set | 1,150 | 1,150 |
9 | Plastic Insulation Covers in a Roll form for covering just Extruded slab. Size: - 1 meter Width, length as per bed length. (100 meter x 4 lane) | 400 R. Mtr. | 1 / mtr | 400 |
10 | Woolen blanket in a Roll form for covering just Extruded slab Size: 1 meter Width, length as per bed length. (100 Mtr x 1mtr X 4 Nos.) | 400 R. Mtr. | 1.3 / mtr | 520 |
11 | Total prices for imported machinery in USD Ex-works Zibo china without any packing, forwarding, insurance & Freight. In words is Thirty four thousand & one hundred twenty only. (Approx. Landed price all inclusive will be 34,120 x100 = INR 34,12,000/- if your company is importing same) | UDS 34,120 | ||
12 | Following Cost not Considered for above plant setup :- Land: - 1.5 Acre for Making Load bearing Hollow core slab with Gantry crane. Size of concrete extrusion bed / platform 110 meters long x 12 meters width for 10 lanes, Cost of all types of Civil work for making Concrete Casting platform or Steel Beds & Abutments, Cost of Plant Electrification, Power 80 / 100KW, Water 10,000 liters, and Plumbing & Drainage Etc. Cement Silos, Other machinery & equipment like Gantry cranes, Machine-washing platform, Water pressure pump for Washing all types of Machines, Protecting steel Frame while doing stressing activity, Wagon for shifting slab to other Storage yard / Go-downs. Tools & equipment for Repair & Maintenance (following items can be purchased/hire like Wheel loader, Hydra, Special types of Lorry for transporting slabs to erecting site etc.), Quality control laboratory Test equipment or out source. Plus charges to be paid to M/s. Ace Associate for Consulting, Designing, Providing Detail Plant layout & Providing all Details specification for plant set-up & details of local purchase items , Periodical Supervision, Telephony Support etc. before commencement of plant. Need to discuss on finalizing of order. Grade of concrete: - For Pre-stressed Concrete Hollow core Load Bearing Slab normally used is M40 Grade. Approx. recipe: - Cement 18%, Sand confirming to Zone 2 is 30%, 20mm aggregate is 31% & 10mm aggregate is 21% plus water free from salt & additives. Total Labor required about 12/15. Span & Load carrying capacity: a). Slab of 120mm Thickness & 600mm Width with 16nos. of steel strand of 5mm dia. Span of slab can be 6mtr and load carrying capacity is 8.86 Kn/ sq. mtr. b). Slab of 100mm Thickness & 600mm Width with 19 nos. of steel strand of 5 mm dia. Span of slab can be 5.1 mtr and load carrying capacity is 8.11Kn/ sq. mtr. |
|||
13 | Production Capacity: - 120 x 600 or 100 x 600 - 76,500 Sq. Feet./ Month & Weight for 120 x 600 – 17/ sq. ft. is & 100 x 600 -15 / sq. ft. Production Cost for 100 x 600 :- Rs. 53 / Sq. Feet with 5 mm Steel Strand & Production Cost for 120 x 600: - Rs. 60 / Sq. Feet with 5 mm Steel Strands. (including RM, Labor, Power, Water, Cutting, Lifting, Wear & Tear, Spare parts, Rejection / Wastage, Land Rent, Amortizing & Depreciation) For More detail specification, Video & Pictures of m/c + Application of Precast elements refer our Website www.Indiaprecast.com |
B - Plant & Machinery for: - Pre-stressed, Precast Load Bearing Hollow Core Concrete Slabs / Planks duly Reinforced with steel strand 150mm thick x 1200mm width
Sr. No | Item Descriptions for plant & machinery for Pre-stressed, Precast Load Bearing Hollow Core Concrete Slabs / Planks duly Reinforced with steel strand 150 thick x 1200mm width |
Qty. | Price in USD Ex- works China | Total Price in USD Ex- works China |
---|---|---|---|---|
1 | Extrusion Machine for Pre-stressed, Precast Load Bearing Hollow Core Concrete Slabs / Planks or for Heavy duty panels for Ware housing etc. Size: - 150 Thick X 1200 mm Wide. Length to cut as per your requirement from a long extruded slab duly Reinforced with carbon steel wires. OR Size: - 200mm thick x 1200mm Width. Price in USD 32,000/ set Ex-works china. | 1 Set | 20,000 | 20,000 |
2 | Hydraulic Stressing / Tensioning Equipment for Steel Strands | 1 Set | 5,700 | 5,700 |
3 | Anchors / Wedges for Steel Strands of 7 mm dia. 80 Nos. | 80 Nos. | 8.5 | 680 |
4 | Anchors / Wedges for Steel Strands of Size 9.5 or 12.7mm Dia. | 100 Nos | 21 | 2,100 |
5 | Dispensing / Pay-off Stand for Steel Strands up-to 7, 9.5 & 12.7mm dia. coil. | 2 Nos. | 475 | 950 |
6 | Complete Concrete Batching Plant - Mixer having Dual body Twin shaft - 35 CBM with 3 Bin dosing & batching -1200 liters + 9mtr cement feeding screw + Cement Metering, Water-metering, Additive measurement Systems + Water & Additive tank + Computerized Control System + Control Room + Air conditioner + Air compressor + internal cables + 2Nos Moisture probes. (Total power required is 60KW) Silos to be purchased locally. Mixer suitable for Zero Slump Dry Concrete having Water Cement Ratio of 0.3%, & is required continuously In order to produce Good quality of Planks | 1 Set | 45,000 | 45,000 |
7 | Universal Dumper (Diesel ) for Delivery of Concrete Mix Capacity - 750 Kgs | 2 Nos. | 5,600 | 11,200 |
8 | Semi-Automatic Slab Cutting Machine for above slab up to 380mm thick x 1200mm width | 1 Set | 5,300 | 5,300 |
9 | Lifting Beam Capacity – 4 Ton, to lift Plank of 8 meters length | 1 Set | 2,700 | 2,700 |
10 | Lifting Beam Capacity – 7 Ton, to lift Plank of 12 meters length | 1 Set | 3,000 | 3,000 |
11 | Plastic Insulation Covers in a Roll form: - To cover Extruded HC slab | 1,560 Sq.Mtr. | 1 / Sq. Mtr | 1,560 |
12 | Woolen blanket in a Roll form for better curing by covering Extruded slab | 1,560 Sq.Mtr | 1.30 / Sq.Mtr | 2,028 |
13 | Total prices for imported machinery as per Sr. No 1to 12 in USD Ex-works Zibo china without any packing, forwarding, insurance & Freight. (Approx. Landed price all inclusive will be 1,00,218 x100 = INR 1,00,21,800/- if your company is importing same) Say 1 Cr. |
USD 1,00,218 | ||
14 | Following Cost not Considered for above plant setup :- Land: - 2 to 3.5 Acre for Making Load bearing Hollow core slab with Gantry crane. 10 beds are required if we are not using steel bed with steam curing. Size of Extrusion bed considered is 130 x 24 meters for 10 beds. Cost of all types of Civil work for making Concrete Casting platform or Steel Beds (Can do on Steel Bed for better underneath finish of casted Hollow Core slab without steam curing) & cost of Abutments , Cost of Plant Electrification, Power 125/175Kw, Water 15000 liters/day, and Plumbing & Drainage Etc. Cement Silos, Other machinery & equipment like Gantry cranes, Machine-washing platform, Water pressure pump for Washing Extrusion Machines, slab cutting m/c & batching plant, Protecting steel Frame / Plate while doing stressing activity, Wagon for shifting slab to other Storage yard / Go-downs. Tools & equipment for Repair & Maintenance (can be purchased/hire Wheel loader, Fork lift, Hydra, Special types of Lorry for transporting slabs to erecting site), Quality control laboratory & material Test equipment. (or out source). Plus charges to be paid to m/s. Ace Associate for Consulting, Designing, Providing Detail Plant layout & Providing all Details specification for plant set-up & details of local purchase items , Periodical Supervision, Telephony Support etc. before commencement of plant. Need to discuss on finalizing of order. | |||
15 | Production Capacity: - 150 x 1200 or 200 x 1200 - 73,500 Sq. Feet./ Month. & Weight for 150 x 1200 - 23 / sq. ft. & 200 x 1200 – 28 / sq. ft. Production Cost 150 x 1200 :- Rs. 65 / Sq. Feet with 7 mm Steel Strands & Production Cost for 200 x 1200 :- Rs. 102 / Sq. Feet with 12.7 mm Steel Strands. (including RM, Labor, Power, Water, Cutting, Lifting, Wear & Tear, Spare parts, Rejection / Wastage, Land Rent, Amortizing & Depreciation) Grade of concrete: - For Pre-stressed Concrete Hollow core Load Bearing Slab normally used is M50 Grade. Approx. recipe: - Cement 18%, Sand confirming to Zone 2 is 30%, 20mm aggregate is 31% & 10mm aggregate is 21% plus water free from salt & additives. Total Labor required about 15/20. Span & Load carrying capacity: 1). 150 x 1200 Slab having 9.5 mm dia. Steel strand of 14 nos. the load carrying capacity will be 10.24 KN/m2 at max span of 7.5 meters. 2). Slab of 200mm Thickness & 1200mm Width having 9.5 mm dia. Steel strand of 10 nos. of, the load carrying capacity will be 13.22 KN/m2 at max span of 10 meters. For more details refer our website. For More detail specification, Video & Pictures of m/c + Application of Precast elements refer our Website www.Indiaprecast.com |
C - Plant & Machinery for :- Pre-stressed, Precast Lightweight Hollow Core Concrete Planks to make partition wall, duly Reinforced with carbon steel wires 90 x 600mm
Sr. No | Item Descriptions for plant & machinery for Pre-stressed, Precast Non- load bearing Lightweight Hollow Core Concrete Planks to make partition wall duly Reinforced with carbon steel wires size 90x600mm |
Qty. | Price in USD Ex- works China | Total Price in USD Ex- works China |
---|---|---|---|---|
1 | Extrusion Machine (Augur Type) for making M40 Concrete Non- load bearing Lightweight Hollow Core Wall panels for making partition walls of Size: - 90 mm Thick X 600 mm Wide, Length to cut as per your requirement from a long extruded slab, Reinforced with carbon steel wires Or Size: - 120 x 600mm Width. Price in USD 12,500/ set Ex-works & Size: - 150 x 600mm Width. Price in USD 14,000/ set Ex-works | 1 Set | 11,500 | 11,500 |
2 | Tensioning / Stressing Machine for reinforcement of steel wires. supplied with 100nos. of Locking Clips for holding steel wire | 1 Set | 1,100 | 1,100 |
3 | Dispensing / Pay off Stand for steel Wire | 1 Set | 230 | 230 |
4 | Concrete Mixer Dual body Twin shaft 25 CBM with 2bin dosing & batching plant 800 liters. (Rotary mixer not suitable for Extrusion) | 1 set | 13,850 | 13,850 |
5 | Battery operated Mini Dumper for unloading concrete mixture into the extrusion Machine | 2 Nos. | 2,700 | 5,400 |
6 | Cutting Machine for Wall panels. Size 180 x 600mm | 1 Set | 1,150 | 1,150 |
7 | Electrical operated Panel Lifting (Hydraulic) Trolley while installation of panels at site | 1 Set | 2,700 | 2,700 |
8 | Steel Lifting Bar & Special 2-wheel trolley for Lifting & Shifting panels from concrete casting bed. | 1 Set | 400 | 400 |
9 | Steel Crow Bar & Mini 2 Tire trolley used at site for gliding / shifting panels during site Installation | 2 Nos. | 75 | 150 |
10 | Galvanized Brackets to hold panels to make wall while installation | 480 Nos. | 0.25 | 120 |
11 | Grouting cement to fill in between Tongue & groove & on the joints of 2 panels | 1 Ton | 800 | 800 |
12 | Total prices for imported machinery as per Sr. No 1 to 11 in USD Ex-works Zibo china without any packing, forwarding, insurance & Freight. Thirty four thousand seven hundred only. (Approx. Landed price all inclusive will be 37,400 x100 = INR 37,40,000/- if your company is importing same) | USD 37,400 | ||
13 | Following Cost not Considered for above plant setup: - Land: - 1 Acre for Making Lightweight Hollow core panels for partition wall. Size of concrete extrusion bed / platform for planks is to have 14 casting lanes of minimum 110 meters long x 1-meter width per casting lane. Total width of casting bed wills 15 meters. Cost of all types of Civil work for making Concrete Casting platform & Abutments, M.S flat of Size 30 x 4mm fixed on the floor for having recession on wall panel, Cost of Plant Electrification, Power 50Kw, Water 8000 liters , and Plumbing & Drainage Etc. Cement Silo, Other machinery & equipment like Gantry cranes, Machine-washing platform, Water pressure pump for Washing Extrusion Machines, slab cutting machine & batching plant, Protecting steel Frame / Plate while doing stressing activity, Wagon for shifting slab to other Storage yard / Go-downs. Tools & equipment for Repair & Maintenance (can be purchased/hire Wheel loader, Hydra, Special types of Lorry for transporting slabs to erecting site), Quality control laboratory & material Test equipment. (or out source). Plus charges to be paid to M/s. Ace Associate for Consulting, Designing, Providing Detail Plant layout & Providing all Details specification for plant set-up & details of local purchase items, Periodical Supervision, Telephony Support etc. before commencement of plant. Need to discuss on finalizing of order. | |||
14 | Production Capacity: - 1,00,000 Sq. Feet for 90 x 600 & Weight for 90 x 600 -13 /sq. ft. Production Cost: - Rs. 40 / Sq. Feet with 3 mm Carbon Steel Wire. & Installation cost is Rs. 20 / Sq. feet. (including RM, Labor, Power, Water, Cutting, Lifting, Wear & Tear, Spare parts, Rejection / Wastage, Land Rent, Amortizing & Depreciation Grade of concrete: - For Pre-stressed Precast Lightweight Hollow Core Concrete Planks normally used is M40 Grade. Approx. recipe: - Cement 17%, Sand confirming to Zone 2 is 30%, & 6/8mm aggregate is 51% plus water free from salt & additives. Total Labor required for production is 12 labors. For More detail specification, Video & Pictures of Machine + Application of Precast elements refer our Website www.Indiaprecast.com |
D - Plant & machinery to make Solid Load bearing Walls & to make Precast Half floor slab / Semi- finished floor (Slab with Lattice girder / Truss / Filigree)
1000 Sq. mtr/day By Pallet circulating system in combination with Central Shifter. 34 Nos. of Pallet of 3.5 x 12 mtrs.
Sr. No | Item Descriptions for Plant & machinery to make Solid Load bearing Walls & to make Precast Half floor slab / Semi- finished floor (Slab with Lattice girder / Truss / Filigree ) - 1000 Sq. mtr/day By Pallet circulating system in combination with Central Shifter. 34 Nos. of Pallet of 3.5 x 12 mtrs |
Qty. | Price in USD Ex- works China | Total Price in USD Ex- works China |
---|---|---|---|---|
1 | Pallets: - size 3.5 x 12 meters | 34 Nos. | 10,500 | 3,57,000 |
2 | Rollers Block Assembly - Fix. + Pallet Support + Dowel plates for Rollers & Pallets | 476 sets. Approx. | 165 | 78,540 |
3 | Compaction / Vibration unit at casting station. (complete set) | 1 set | 45,000 | 45,000 |
4 | Rollers Block Assembly- Lifting/ Lower able (Used for Compaction / Vibration station) | 14 Nos. Approx. | 250 | 3,500 |
5 | Friction Drive Wheel Block - Lifting / Lower able - (Used for Compaction / Vibration station) | 2 Nos. Approx. | 2,400 | 4,800 |
6 | Central & side shifter for Pallet size 3.5 x 12 mtr (complete set) | - | - | - |
7 | Concrete Spreader / Distributor unit at casting station. (Alternatively can use Transit mixer to pour concrete on pallet). Price USD 75,000 per set ex-works china |
2 Nos. | 5,600 | 11,200 |
8 | Track / guide rail complete for Concrete Spreader / Distributor. (No need to buy if using Transit mixer). Price USD 1250/meter req. approx. 25 meters . Price is ex-works china | - | - | - |
9 | Tilting station (complete set) (Alternatively can use 2 EOT cranes or a Hydra & EOT crane to lift the element from pallet) Price USD 45,000 per set ex-works china |
- | - | - |
10 | Spare Parts i.e. Limited Spares for above equipment. Will be discuss while placing order. | - | - | - |
11 | Concrete Skip / bucket (Purchase locally). About 2 lakhs for 1.5CBM | - | - | - |
12 | Leveling Screed Moved Manually (Purchase locally) | - | - | - |
13 | Guide rail for central shifter (Purchase locally). Approx. 1084 | - | - | - |
14 | Embedded parts - M.S. Welded to be fitted on the plant floor as per layout drawing (To be made locally). | - | - | - |
15 | Cameras on each work station & monitor to be Purchase locally. | - | - | - |
16 | Shuttering: - The Size & quantity can be worked out as per your drawing. Price USD 18 per running meter | - | - | - |
17 | Stop ends: - The Size & quantity can be worked out as per your drawing. Price USD 18 per running meter | - | - | - |
18 | Magnetic blocks: - Used for locking of shuttering material etc. Force: - 450kN. Price USD 75 per pc ex-works china | - | - | - |
19 | Accessories (Can be quoted once we get your exact Shop floor drawing. | - | - | - |
20 | Charges to be paid for Supervision on installation and commissioning (3 person) + Conducting trails by Chinese team is consist of two parts:- A). The cost of the installer is USD 125 / day / person B). Buyer need to pay return Airfare for Chinese persons + Hotel Accommodation, transportation too & fro to project site + Daily meal etc. (To be discussed before placing order) | - | ||
21 | Charges to be paid for Training on-site & Technical Service Cost by Chinese Technician along with our person (5/7days) will be @ USD 125 /- per person per day in advance. Buyer need to pay return Airfare for Chinese Technicians + good Hotel accommodation, Transportation too & fro to project site + Daily Meal etc. (To be discussed before placing order) | - | ||
22 | Plus charges to be paid to M/s. Ace Associate for Consulting, Designing, Providing Detail Plant layout & Providing all Details specification for plant set-up & details of local purchase items , Periodical Supervision, Telephony Support etc. before commencement of plant. Need to discuss on finalizing of order. | - | ||
23 | (Approx. Packing Cost & Freight Cost For above can be worked out once you finalize the equipment.) | - | ||
24 | Total prices for imported machinery as per Sr. No 1 to 10 in USD Ex-works china without any packing, forwarding, insurance & Freight. (Approx. Landed price all inclusive will be 5,81,840 x100 = INR 5,81,84,000/- if your company is importing same) For More detail specification, Video & Pictures of m/c + Application of Precast elements refer our Website www.Indiaprecast.com |
USD 5,81,840 |
E - Plant & machinery to make Solid Load bearing walls & to make Precast Half floor slab / Semi- finished floor (Slab with Lattice girder / Truss / Filigree )
1000 Sq. mtr/day By Pallet placed in-line & Vibrated & Tilted by Mobile vibrating & Tilting shuttle (MVTS) 20x2=40 Pallet of size 4 x 9 mtr
Sr. No | Item Descriptions Plant & machinery to make Solid Load bearing walls & to make Precast Half floor slab / Semi- finished floor (Slab with Lattice girder / Truss / Filigree ) 1000 Sq. mtr/day By Pallet placed in-line & Vibrated & Tilted by Mobile vibrating & Tilting shuttle (MVTS) 20x2=40 Pallet of size 4 x 9 mtr Placed in 2 lanes |
Qty. | Price in USD Ex- works China | Total Price in USD Ex- works China |
---|---|---|---|---|
1 | Pallet size length 9meter x width 4 meters without 4 Nos. of pedestal block. | 20 x 2 = 40 Nos. | 9,000 | 3,60,000 |
2 | Mobile Shuttle / Cart with Vibrators & Tilting arrangement (MTVS): - for pallets of size 9 x 4 meter (complete set) | 1 set | 80,000 | 80,000 |
3 | Flexible Stopper for above Mobile Tilting shuttle / cart. | 48 Nos. | 52 | 2,496 |
4 | Fixed Stopper for above Mobile Tilting shuttle / cart. | 48 Nos. | 60 | 2,880 |
5 | Ferry / Side-shifter for above MTVS (Sr. no. 2) The work of is to shift m/c (MTVS) from 1 lane to another. (20 pallets in 1 lane expandable to 29 pallets) |
1 set | 30,000 | 30,000 |
6 | Pedestal blocks for above Sr. no 1 (MTVS) 4 nos x 40 = 160. To be purchased locally. | - | - | - |
7 | Rail guide for above Sr. no 2 (MTVS) - Type 24 kg / meter. for 40 Table of 4 x 9. To be purchased locally. | - | - | - |
8 | Optional: - Speedy - Concrete Casting Vehicle on wheels. Having Built in hopper with conveying screw. Easy maneuvering over pallet to dispense concrete compared to Transit mixer. It collects the concrete from batching plant & dispenses on Pallet. Ex-works price is USD 52,000/- | - | - | - |
9 | Concrete Skip / bucket (Purchase locally) About 2 lakhs for 1.5 CBM | - | - | - |
10 | Leveling Screed Moved Manually (Purchase locally) | - | - | - |
11 | Shuttering: - The Size & quantity can be worked out as per your drg. Price USD 18 per running meter | - | - | - |
12 | Stop ends: - The Size & quantity can be worked out as per your drg. Price USD 18 per running meter | - | - | - |
13 | Magnetic blocks: - Used for locking of shuttering material etc. Force: - 450kN. Price USD 75 per pc | - | - | - |
14 | Accessories (Can be quoted once we get your exact Shop floor drawing. | - | - | - |
15 | Charges to be paid for Supervision on installation and commissioning (3 person) + Conducting trails by Chinese team is consist of two parts:- A). The cost of the installer is USD 125 / day / person B). Buyer need to pay return Airfare for Chinese persons + Hotel Accommodation, transportation too & fro to project site + Daily meal etc. (To be discussed before placing order) | - | ||
16 | Charges to be paid for Training on-site & Technical Service Cost by Chinese Technician along with our person (5/7days) will be @ USD 125 /- per person per day in advance. Buyer need to pay return Airfare for Chinese Technicians + good Hotel accommodation, Transportation too & fro to project site + Daily Meal etc. (To be discussed before placing order) | - | ||
17 | Plus charges to be paid to M/s. Ace Associate for Consulting, Designing, Providing Detail Plant layout & Providing all Details specification for plant set-up & details of local purchase items , Periodical Supervision, Telephony Support etc. before commencement of plant. Need to discuss on finalizing of order. | - | ||
18 | (Approx. Packing Cost & Freight Cost For above can be worked out once you finalize the equipment.) | - | ||
19 | Total prices for imported machinery as per Sr. No 1to 10 in USD Ex-works china without any packing, forwarding, insurance & Freight. (Approx. Landed price all inclusive will be 4,75,376 x100 = INR 4,75,37,600/- if your company is importing same) For More detail specification, Video & Pictures of m/c + Application of Precast elements refer our Website www.Indiaprecast.com |
USD 4,75,376 |
H - Staircase Mold
1 | Staircase Vertical Form molds with M.S. Steel Operating Platform (Without Flight & Landing) Mechanical jacking with Gaskets & Rubber seal strips basement without anti-vibration pad. Nos. of vibrators: 2 Power, 1.5KW, Curing system: with heating pipe and its fittings. Cast’s one piece at a time. Nos. of step 9 having width of 340mm, outer width of stairs is 1500 mm, Height of steps150mm. The diagonal depth of 175 mm & the stairs bottom thickness of 275mm The edges of stairs are 90° sharp. | USD 8,500 |